Sunnyside Canal Improvement

Project included the construction of six (6) 75’ wide concrete irrigation canal check structures and one (1) concrete irrigation diversion box.  Each check structure included sheet pile cut off walls, dewatering, cold weather excavation and concrete work.  This project required significant resource allocation for the number of structures during the winter months in a very short construction window.  Completion times were critical for the irrigation season, project durations were short and within the window the canals were not in operation, and construction season during the coldest part of the year.

Value: $725,000