Picnic Point Wastewater Treatment Plant

This $73 Million upgrade is a two Phase construction project to replace an existing WWTP with a new Enviroquip Membrane Filtration System

Phase one is the liquid stream portion of the project which includes the head works, effluent structure, head works screening facility, aeration basin, process mechanical facility, and membrane tanks. Process Mechanical Building includes the project’s stand-by generator and UV system for final sterilization of plant affluent. Upon completion successful start-up of those facilities and the installation of temporary centrifuge solids handling equipment, we will tear down the existing facility and construct a new solids handling facility including centrifuge, solids drying equipment, and a new operations and control building.