Fort Peck Tribe Water System Intake

Fort Peck Tribe Water Treatment Plant Phase 1

Owner: Fort Peck Assiniboine Sioux Tribes Value: $13,773,728 Designer Engineer:Morrison-Maierle, Inc. Location: Wolf Point, MT

Project consisted of construction of a 52Ft by 182ft Clearwell Pumping Station and a 70Ft by 93Ft Backwash Separation and Pumping Station. Excavation crews dug over 30 feet deep for the Backwash structure and 25 feet for the Clearwell. Over 7,500 Cy of concrete were poured between the to structures. The two facilities were complete with electrical services, HVAC systems and Non-potable water systems. Pumps installed included (2) 125 Hp Backwash, (6) 350 Hp, (4) 125 Hp Vertical Turbine Pumps and all associated piping.

Escort Bayan